Work goes slowly. Took down four more trees, cut limbs & logs. Got eight more trees to go, and these are serious, large, and in the lot corner next to three neighbors… with a fence around. I’m gonna get a professional to rig them and pull them in the right direction into my lot. Once he gets them on the ground, then I cut and section them and drag logs and branches up to the front. THEN we call in the ‘chipper’ to make all the wood into a mulch pile. Last pile of trees filled the box of a 2-1/2 ton truck before he emptied it out. I expect the same again. The chips make good fill for the rocky areas.
In between the big stuff, there’s still lawn mowing, and hacking the big weeds that keep coming over the fence from the jungle next door. I average half a dozen pickup loads of green waste every week. I keep dreaming of the nice flat lot my neighbor has, with a riding lawnmower…. someday.