Bulk sample processing results from Osisko Mining’s Windfall Lake project came in ahead of company expectations with average head grades of 17.8 g/t gold exceeding the 9.4 g/t predicted by infill drilling.
“The significant grade increase from the block model appears to correspond well with the very regular visible gold observed in Lynx drilling. The bulk sampling work is greatly helping to build our confidence in the continuity, grade, recoveries and the predictability of the mineralized zones at Windfall,” John Burzynski, Osisko Mining president and CEO said in the media release.
cont. https://www.mining.com/positive-reconciliation-for-osiskos-windfall-bulk-sample/